The English version is for reference only. If there is any inconsistency or conflict between the English and Chinese version, the Chinese version shall prevail.
I. Operation Basis
Management Measures for Review of Construction Drawing Design Documents of Houses and Municipal Infrastructures, Plan on Reforming of Management Procedures for Administrative Approval of Construction Projects in Shanghai, Implementation Measures for Reforming of Administrative Approval Procedures of Construction Projects in Shanghai Comprehensive Bonded Zone (trial), Operation Procedures for Review of Construction Project Design Documents of the Investment Projects in Shanghai Comprehensive Bonded Zone (trial)
II. Scope of Application
As for projects invested in by enterprises in the Zone, the construction unit and the review authorities have signed the contract for review of design documents according to the applicable regulations.
III. Required Materials
1. Filing Form of Contract for Review of Construction Drawing Design Documents of Construction Projects, or Filing Change Form of Contract for Review of Construction Drawing Design Documents of Construction Projects
2. One copy of the contract for review of construction drawing design documents as signed by both parties
3. Appendices to the contract and other relevant materials
IV. Handling Place and Contact Method
Room 1708, No. 9 Jilong Road, Pudong New Area, Shanghai
Post Code: 200131
Contact: Guo Aiqin
Contact Tel.: 021-58697737
Fax: 021-58698720
V. How to Lodge a Complaint
Mode of Complaint to the Management Committee of the China (Shanghai) Pilot Free Trade Zone
Tel.: 021-58697800
Fax: 021-58698705
E-mail: ftzts@pudong.gov.cn
Provided by Lawyers Working Committee of Pudong New Area