I. Operation Basis
Management Measures for Review of Construction Drawing Design Documents of Houses and Municipal Infrastructures, Plan on Reforming of Management Procedures for Administrative Approval of Construction Projects in Shanghai, Implementation Measures for Reforming of Administrative Approval Procedures of Construction Projects in Shanghai Comprehensive Bonded Zone (trial), Operation Procedures for Review of Construction Project Design Documents of the Investment Projects in Shanghai Comprehensive Bonded Zone (trial)
II. Scope of Application
Projects invested in by enterprises in the Zone that have been completed the formalities for filing of review contracts; the design documents that satisfy the depth of the technical guidance requirements of the governmental authorities; and the technical consulting has been completed, and the review authorities have issued the technical consulting report.
III. Required Materials
1. Application for Consulting of Technical Guidance Opinions on Review of Design Documents of Construction Projects in Shanghai Comprehensive Bonded Zone (stamped)
2. Design documents and other relevant materials satisfying the depth of the technical guidance requirements
IV. Handling Place and Contact Method
Room 1708, No. 9 Jilong Road, Pudong New Area, Shanghai
Post Code: 200131
Contact: Guo Aiqin
Contact Tel.: 021-58697737
Fax: 021-58698720
V. How to Lodge a Complaint
Mode of Complaint to the Management Committee of the China (Shanghai) Pilot Free Trade Zone
Tel.: 021-58697800
Fax: 021-58698705